5kL/Day SEWAGE PACKAGE PLANT FOR MACCAFERRI
- Clearedge Projects
- May 16
- 1 min read
Another compact sewage treatment system commissioned successfully for Maccaferri Africa in Tongaat, KZN.

This 5kL/day package plant was designed to treat domestic sewage generated from the factory facility — with a focus on the same principles we prioritise on every project:
Reliable operation
Low maintenance requirements
Simple day-to-day management
Consistent compliant discharge quality
The system consists of:
Collection sump
2 x septic tanks
Balancing tank
2 x bioreactors
Contact tank
One of the bioreactors incorporates our compact internal biofilter design, eliminating the need for a separate clarifier on smaller systems. Fewer components means a smaller footprint, simpler operation, and reduced maintenance requirements.
Treated effluent is discharged to the stormwater system in accordance with the required discharge objectives.
At Clearedge Projects, we believe wastewater treatment systems should work quietly in the background — without becoming an operational burden for the client.



















Comments